The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (20%)
- Plans and specifications
- Estimation
- Standards, codes, & regulations
- General building mathematics
- (8%)
- Structural framing
- Seismic safety
- Basic engineering
- (18%)
- Worker and site safety
- Traffic control
- Environmental impact
- (15%)
- Earthwork
- Soils and geology
- Surveying
- Site preparation
- (20%)
- Shoring and scaffolding
- Permanent and temporary piling
- Waterproofing
- Utilities
- Tunneling, drilling, and boring
- Drainage and water work
- Trenching and pipeline
- Sewers, water, and storm drain systems
- (9%)
- Concrete principles and placement
- Forms and falsework
- Foundations
- (5%)
- Industrial plants
- Mechanical, electrical, and plumbing
- Masonry
- Painting and coating
- Demolition
- (5%)
- Highways and roads
- Parking lots