California Contractor School Online®
National Contractors License Bureau
The premiere contractor school to assist you in passing your state contractor license exam.
State Test Contents

C-23 Ornamental Iron Work

The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:

  1. Project Planning and Estimating (25%)
    • Jobsite measurements and calculations
    • Shop specifications
    • Installation requirements

  2. Ornamental Metal Fabrication (24%)
    • Material layout and preparation
    • Pre-fabrication and metal forming
    • Metal fabrication

  3. Grinding and Finishing Ornamental Metal (12%)
    • Metal preparation
    • Metal finish

  4. Onsite Installation of Ornamental Metal (15%)
    • Product delivery and critical path coordination
    • Drilling, assembly, and finishing

  5. Safety (24%)
    • Fire prevention
    • Shop and jobsite equipment
    • Working in elevated areas