The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (15%)
- Hardscape design
- Drainage design
- Irrigation system
- Plant selection
- Mulch selection
- (23%)
- Scope of work
- Time estimation and labor cost
- Equipment and tool selection
- Drainage and irrigation materials
- Softscape materials
- Hardscape materials
- (13%)
- Drainage control
- Erosion control
- Underground piping installation
- Soil amendment
- (9%)
- Concrete and masonry
- Retaining walls
- Landscaping edgings
- Fences, gates, screens, and steps
- Water features
- Electrical connections
- Lighting
- (18%)
- Controllers
- Main lines
- Lateral lines
- Drip system components
- (13%)
- Planting methods
- Water management
- Plant maintenance
- Turfgrass management
- (9%)
- Hazard Identification
- Personal protection
- Environmental protection