The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (28%)
- Assessment of job site conditions
- Materials selection
- Materials calculation
- Equipment and tools
- (11%)
- Causes of paint failure
- Substrate repair
- Removal of wallcoverings
- (23%)
- Site protection
- Preparation of sound surfaces
- Preparation of contaminated surfaces
- Preparation of failed coatings
- Preparation of surfaces for wallcovering
- Pressure washing
- Repair of holes and cracks
- (14%)
- Application of primers
- Application of finishes
- Application of specialty coatings
- (7%)
- Exterior surfaces
- Interior surfaces
- Refinishing
- (17%)
- Hazard identification
- Elevated work
- Personal protection
- Waste disposal