The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (29%)
- Plans, specifications, and soil conditions
- Field verification
- Equipment and materials calculations
- Removal and placement
- (25%)
- Pre-construction verification
- Excavation techniques and calculations
- Backfill, compaction, and resurfacing
- Demolition and removal
- (31%)
- Water distribution systems
- Sewer and storm drain systems
- Electrical and communication systems
- Petroleum and gas systems
- Heavy equipment operation
- (15%)
- Traffic control
- Trench shoring and sloping
- Confined spaces
- Personal protective equipment
- Equipment safety