State Test Contents

C-34 Pipeline

The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:

  1. Estimating and Planning (29%)
    • Plans, specifications, and soil conditions
    • Field verification
    • Equipment and materials calculations
    • Removal and placement

  2. Trenching and Excavation (25%)
    • Pre-construction verification
    • Excavation techniques and calculations
    • Backfill, compaction, and resurfacing
    • Demolition and removal

  3. Pipeline System Installation (31%)
    • Water distribution systems
    • Sewer and storm drain systems
    • Electrical and communication systems
    • Petroleum and gas systems
    • Heavy equipment operation

  4. Job Site Safety (15%)
    • Traffic control
    • Trench shoring and sloping
    • Confined spaces
    • Personal protective equipment
    • Equipment safety