NOTE: All questions are written and reviewed by licensed contractors who are actively working in the field.
The following questions are typical of the kind of items that are on the examination.
The correct answer is highlighted.
- Any building built prior to 1978 being demolished it should be checked for what
- a. records indicating asbestos is present
- b. obtain permits
- c. call OSHA
- d. none of the above
- The entire pool pressure piping system, when ready for inspection, shall be tested with a water test of ____ psi.
- The water supply to flush tanks equipped for automatic flushing is controlled by a ________.
- a. flush valve
- b. timing device
- c. overflow valve
- d. valve