The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (10%)
- Sanitation system location
- Sanitation system type
- Soil conditions
- (13%)
- Sizing of sanitation system
- Plans and specifications
- Sanitation system components
- (50%)
- Excavation and trenching
- Septic systems
- Sewer systems
- Storm drains
- Pumps and monitoring systems
- Drawings, permits, and inspection
- (11%)
- Cleaning techniques
- Inspection methods
- Repair, replacement, and rehabilitation procedures
- (16%)
- Job site safety
- Personnel safety