  1. When engineering calculations are required for a sign, who is authorized to prepare these calculations?

    • a. a licensed mechanical engineer
    • b. a licensed C45 (Electrical Sign) contractor
    • c. a licensed civil engineer
    • d. a licensed A (General Engineering) contractor

  2. When manufacturing a rain lip on an exterior exposed raceway, where on the raceway should the rain lip be located?

    • a. left side
    • b. bottom
    • c. right side
    • d. top

  3. Whose guidelines/specifications should be followed when determining load capacities for crane and lifting equipment?

    • a. project manager and engineer
    • b. building owner and architect
    • c. project manager and the EPA
    • d. equipment manufacturer and Cal/OSHA