The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- Below Ground Site Preparation (7%)
- Assess site and site conditions
- Make required site modifications
- Above Ground Site Preparation (10%)
- Evaluate home placement conditions and requirements
- Plan and install foundation
- Home Installation (29%)
- Complete planning, permitting, and inspection procedures
- Begin rough set
- Complete rough set
- Finish Work on Installed Home (6%)
- Prepare for and make desired alterations
- Auxiliary and Miscellaneous Installations (9%)
- Plan and prepare to install accessories
- Assemble and install accessories
- Below House Repair, Remodeling, Renovation, Retrofitting (11%)
- Repair damage caused by settling or shifting of home or site
- Repair damage caused by wear, water, and utility delivery interruption
- Structural Repair, Remodeling, Renovation, Retrofitting (15%)
- Repair utility systems and appliances
- Repair home and peripheral structures
- Safety (13%)
- Plan for safe delivery of home to the site
- Use safety precautions during installation of home