California Contractor School Online®
National Contractors License Bureau
The premiere contractor school to assist you in passing your state contractor license exam.
State Test Contents

C-7 Low Voltage Systems

The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:

  1. Pre-Installation, Coordination, & Design (15%)
    • Interpretation and application of plans for low voltage systems
    • Compliance with codes
    • Coordination with owner, architect, & other trades

  2. Installation of Low Voltage Systems (48%)
    • Pre-wiring
    • Installation of various low voltage systems (e.g., fiber optic, voice, and data, cable TV/satellite)
    • Testing methods and testing equipment

  3. Troubleshooting Low Voltage Systems (13%)
    • Troubleshooting
    • Repair/Replacement of low voltage systems and components

  4. Safety (24%)
    • Identification of work site hazards
    • Safe work practices